Surinamekade 6
1019 BV Amsterdam
info@premiumropes.com

 Mail de Lijnenspecialist  + 31 20-4196412

DEVERLOPER TOOLBAR

Cache: Enabled (Disable / Refresh)
Profiler: Disabled (Enable)
Template Path Hints
+ Frontend: Disabled (Enable)
+ Backend: Disabled (Enable)
Logs: Enabled (Disable)
Allow Symlinks: Disabled (Enable)
Translate Inline
+ Frontend: Disabled (Enable)
Merge JavaScript Files Disabled (Enable)
Merge CSS Files: Disabled (Enable)
URL Rewrite: Enabled (Disable)
Add Store Code to Urls: Disabled (Enable)
Store Offline: Disabled (Enable)
Powered by Mage-World.com
Product Name:
Custom Made Guard Rail
Delivery Time:
3 days

Diameter:
Price (per meter incl. VAT):
€0.00

Swage terminal or riggingscrew? Yes No

Explanation swaging and how to measure, click here.

It is very important that the measurement of your rigging is done precisely. Please take note of our instructions below.

Make sure to measure in meters!, so 10.235 means 10 meters 23 cm and 5mm

Measuring wire rope fork to fork

Fork to forkMeasure heart  fork pin to heart of the other fork pin.

 

 Measuring wire rope eye to eye

Eye to eye-terminal: Measure from heart diameter eye hole to heart of the other diameter eye hole. 

 

                                 new 1/2

How to measure wire rope

Fork with rigging screw to stemball terminal: Measure from heart rigging screw pin to the end of the stemball
terminal, rigging screw as tuned on the yacht.
New rigging screw will be delivered to measument with 1/2 screwed, enough tuning options both ways.

 

 How to measure wire rope

Both ends a stud threaded terminal: Measure the length between end of the tread of terminal 1 and terminal 2. 

                                  new 1/2

How to measure wire rope

Toggle with rigging screw to T-terminal: Measure from heart rigging screw pin up to the inner side of the T-terminal, 
rigging screw as tuned on the yacht. 
New rigging screw will be delivered to measument with 1/2 screwed, enough tuning options both ways.

 

 

                                  new 1/2

How to measure wire rope

Toggle with rigging screw to eye: Measure from heart rigging screw pin up to heart of the diameter eye hole
rigging screw as tuned on the yacht. 
New rigging screw will be delivered to measument with 1/2 screwed, enough tuning options both ways.

 

                                  new 1/2 

 How to measure wire rope

Toggle with rigging screw to fork: Measure from heart rigging screw pin up to fork terminal pin, 
rigging screw as tuned on the yacht. 
New rigging screw will be delivered to measument with 1/2 screwed, enough tuning options both ways.

 

 

Custom Made Guard Rail

  • Specifications
  • Description

Guard Rail :

Replace your railing every 10 years for the obvious safety reasons. We offer you a new guard rail for your boat for a great price, just put in your measurements and we will make a new guard rail for you and sent it to you. Available in 4 mm and 5 mm wire ripe and with-or without white PVC coating. You can choose between guard rail with an eye (option 1: eye-fork) or guard rail with a rigging screw (optoin 2: rigging screw - fork). Option 1 comes with a dyneema lash.

Most commonly used is the top guard rail in 5 mm, and the lower in 4 mm wire rope. Do also check your class rules when sailing regatta's in order to comply with the class rules to measurements. 

measuring Guard Rail 

Terminal fork  
Fork terminal  Terminal with railing eye  Turnbuckle 


How to measure the guard rail?

Option 1: Eye - Fork, measured on the inside of the eye up to and including heart of the fork, this length is specified in the order. For the rope lash  may be held 10-15 cm for adequately adjusting possibility.

Option 2: Spanner - Universal, measuring clevis pin at heart of the tensioner t / m heart as confirmed on the ship, this length is specified in the order. The new guard rail comes with the tension half screwed on properly both sides suggest possibilities.

Dyneema

It is also possible make the guard rail out of Dyneema, do make sure the pullpits feeds have rounded edges to envoided incision. The constructon of the splicing has to be done on locaton. For further explantion of the possibilies please contact us. 

Note: dyneema guard rail is in most classes not allowed.